Kementerian Kerja Raya Langkau ke kandungan utama

Seri Kembangan folks have no access to KL-Putrajaya highway

THE Kuala Lumpur-Putrajaya Highway may offer a swift and smooth drive to the city centre but road users in Seri Kembangan are annoyed because they cannot access the thoroughfare.

There are no entry and exit points between Seri Kembangan and the 26km-long expressway opened on Dec 13 last year. The expressway links with major roads and highways like the MRR1, MRR2, Besraya, NPE, KL-Seremban Highway and Kesas.

Floods and hailstorms hit KL

KUALA LUMPUR: Flash floods caused by clogged drains brought traffic to a crawl in Jalan Pahang while hailstorms hit several parts of the Klang Valley.

The downpour since afternoon forced the Stormwater Management and Road Tunnel (SMART) to be closed at 3pm for flood mitigation operations.

"SMART calls on motorists to be patient. Current information will be given to the media from time to time," the operators said in a statement.

The water level started rising at about 2pm near Bulatan Pahang after the downpour.

Fraser's Hill image slip sliding away

RAUB: It's anyone's guess as to how much longer Fraser's Hill will survive as a tourist resort

The hamlet on a cluster of seven hills straddling the Pahang-Selangor border is in imminent danger of dying out.

Almost everything seems to be working against it: landslides have cut off one of the two access roads to the resort, public transportation is almost non-existent and tourists are preferring other highland resorts. 

Apathy brings historical signpost to the ground

IPOH: For more than 40 years, a concrete signpost erected by the Ipoh-Lahat trunk road served as a reminder for the people to forge unity through the use of the national language. 

The slab, with the words Utamakan-lah Bahasa Kebangsaan (Give prominence to the national language), was also reminiscent of the days when the national language was known simply as bahasa kebangsaan. 

Today, the signpost, erected by the Perak government immediately after independence, lies broken by the roadside near the junction to the Bukit Merah industrial and residential areas.

Sistem amaran Smart dikaji

KUALA LUMPUR: Jabatan Pengairan dan Saliran (JPS) akan mengkaji smula mekanisme sistem amaran penutupan terowong Projek Pengurusan Air Banjir dan Terowong Jalan Raya (Smart) bagi membolehkan pengguna laluan berkenaan mendapat maklumat tepat dalam tempoh singkat.

Menteri Sumber Asli dan Alam Sekitar, Datuk Douglas Unggah Embas, berkata kajian semula dengan kerjasama Lembaga Lebuh Raya Malaysia (LLM) akan membolehkan penguna membuat keputusan segera menggunakan laluan alternatif sekali gus mengelak kesesakan teruk setiap kali terowong Smart ditutup selepas hujan lebat.

Pengguna perlu sedar fungsi SMART

KUALA LUMPUR 27 Mac - Pengguna jalan raya perlu sedar fungsi utama Terowong Pengurusan Air Banjir dan Jalan Raya (SMART) adalah untuk mengawal kejadian banjir kilat dan bukan laluan trafik.

Menteri Sumber Asli dan Alam Sekitar, Datuk Douglas Uggah Embas berkata, penutupan terowong pada Sabtu lalu adalah prosedur biasa dalam mengawal banjir kilat di ibu negara.

Beliau berkata, penutupan itu dilakukan bagi membolehkan penyaluran air ke kolam-kolam takungan untuk mengelak banjir.

Penduduk minta hapus segera tol Sungai Nyior

BUTTERWORTH 27 Mac - Rakyat Pulau Pinang mahu kerajaan negeri yang dikuasai DAP supaya menghapuskan segera bayaran tol di Jambatan Pulau Pinang dan Plaza Tol Sungai Nyior di sini seperti yang dijanjikan oleh parti itu pada Pilihan Raya Umum Ke-12.

Rata-rata penduduk yang ditemui nyata tertunggu-tunggu dan menaruh harapan tinggi agar janji kerajaan negeri untuk memansuhkan kutipan tol di kedua-dua laluan berbayar itu dapat ditunaikan secepat mungkin.

Projek jambatan ketiga di Klang siap dua setengah tahun

KLANG : Projek pembinaan jambatan ketiga melintasi Sungai Klang sepanjang 3.8 km di sini yang melibatkan kos RM 23. juta dijangka siap sepenuhnya dalam masa dua setengah tahun, kata Menteri Kerja Raya, Datuk Seri S. Samy Vellu.

Katanya, kerja pembinaan kemudahan jalan raya dan jambatan untuk projek berkenaan akan dimulakan dalam tempoh empat bulan ini.

"Saya percaya dalam tempoh  empat bulan ini bolehlah kita mula projek ini.Reka bentuk  untuk projek semuanya sudah selesai dan tawaran akan dipanggil secepat mungkin," katanya.

Subscribe to