Salak Jaya toll plaza closed
PEOPLE using the Sungai Besi Highway will be able to link up to the Middle Ring Road 2 (MRR2) upon the completion of the highway?s 12.3km extension, which will be constructed at a cost of RM649mil.
The announcement was made by Works Minister Datuk Seri Mohd Zin Mohamad after he announced that the Salak Jaya toll plaza on the same highway would be closed, saving motorists RM1.30 in toll in each direction.
The extension of the highway, dubbed the Besraya Elevated Expressway (BEE), will, however, have one toll plaza.